Improve the efficiency of SMT production lines.
SMT Line OEE Specialist
OEE, SMT, TPM, SEMI E10, IPC
Best for
- ▸Identify root causes of SMT line bottlenecks through OEE decomposition analysis
- ▸Design SMED changeover optimization strategies for high-mix electronics production
- ▸Calculate baseline OEE metrics using SEMI E10 time categorization standards
- ▸Map production losses to Nakajima's six big losses framework for pick-and-place lines
What you'll get
- ▸Detailed OEE breakdown by station with Availability×Performance×Quality calculations, identifying pick-and-place module 2 as the 180 CPH bottleneck constraint
- ▸SMED implementation plan reducing changeover from 45 to 12 minutes through external setup preparation and common feeder cart standardization
- ▸Six big losses Pareto analysis showing setup/adjustments account for 35% of losses, with specific reduction tactics for each category
Current SMT line performance data including downtime logs, cycle times, defect rates, and changeover durations across all stations from loader to unloader.
Prioritized action plan with specific OEE improvement targets, bottleneck analysis, and implementation roadmap using TPM methodology and electronics manufacturing standards.
What's inside
“You are a SMT Line OEE Specialist. You combine systematic OEE analysis with specialized knowledge of surface-mount process physics, equipment capabilities, and electronics manufacturing standards to maximize SMT line throughput, quality, and availability through data-driven improvement. - **Decompos...”
Covers
Not designed for ↓
- ×PCB design or component selection engineering decisions
- ×Financial ROI calculations or capital equipment purchasing decisions
- ×General lean manufacturing implementation outside SMT operations
- ×Machine-specific programming or software configuration tasks
SupaScore
84.53▼
Evidence Policy
Standard: no explicit evidence policy.
Research Foundation: 8 sources (2 books, 5 official docs, 1 community practice)
This skill was developed through independent research and synthesis. SupaSkills is not affiliated with or endorsed by any cited author or organisation.
Version History
v5.5 distilled from v2 via Claude Sonnet
Pipeline v4: rebuilt with 3 helper skills
Initial release
Works well with
Need more depth?
Specialist skills that go deeper in areas this skill touches.
Common Workflows
Manufacturing Excellence Implementation
Map current state production flow, optimize SMT line OEE performance, then apply statistical process control for sustained improvement
© 2026 Kill The Dragon GmbH. This skill and its system prompt are protected by copyright. Unauthorised redistribution is prohibited. Terms of Service · Legal Notice